Type: | Powerline Drone For Transmission Line Construction | Axle Distance: | 1080mm |
---|---|---|---|
Maximum Take-off Weight: | 14kg | Maximum Flight Distance: | 2-4km |
Working Temperature: | -5℃-50℃ | Flight Mode: | Manual Control; ATT; GPS |
High Light: | gps powerline drone,transmission line construction powerline drone,gps drone power lines |
NPA-805H 8-wing Powerline Drone For Transmission Line Construction With GPS
NPA-805H | |||||
Axle distance/Height | 1080mm/450mm | Camera | Single Axis Gimbal 720P | ||
Fail-Safe | with | GPS | with | ||
Maximum tension | 8kg | No-load endurance | 25-30min | ||
Maximum take-off weight | 14kg | Load endurance | 12-18min | ||
Flying speed | 0~15m/min | Flight mode | Manual control; ATT; GPS | ||
Empty weight | 4kg | Battery | 16000mAh 6S | ||
Maximum flight distance | 2-4km | Flight height | 0-1000m (adjustable) | ||
Working Temperature | -5℃---50℃ | Diameter of traction rope | 2-4mm | ||
Functions: GPS positioning, full-auto return, semi-auto return, runaway protection, headless mode, heading lock, low-voltage protection alarm, battery power backhaul, national exclusive high beam function, OSD flight data real-time backhaul, etc. | |||||
1 | Drone with DJI flight control system | 1 set | |||
2 | Dual channel charger | 1 set | |||
3 | Professional remote control | 1 set | |||
4 | 16000mah high quality battery | 3 pcs | |||
5 | 6.5” screen mobile phone | 1 pcs | |||
6 | Battery voltage capacity checker | 1 set | |||
7 | Tool kits | 1 set | |||
8 | Aviation aluminum box | 1 pcs | |||
9 | Spare screws | 1 pack | |||
10 | Backup battery strap | 4 pcs | |||
11 | Spare propeller | 8 pcs |
Application
The trees in the virgin forests often encounter bushes, virgin forests, etc. during the construction of the national grid.
This will definitely affect the progress of the construction.
When passing through the virgin forest, the trees cannot be felled.
This undoubtedly adds a lot of difficulty to the construction of the project, and with the lined drone, it is easy to fly over the trees and cast a guide rope to the ground.
In the traditional wire-laying operation on the Yangtze River, the tow rope can only be towed by the tugboat over the water surface.
The construction water surface must be sealed first.
The closure of the navigation will also cause many economic losses to the country and the construction party.
The personnel stood on the ship and remotely dragged the helicopter of the guide rope so that the guide rope could fly over the Yangtze River and avoid sealing.
In the construction will also encounter swamps, lakes, farmland, highways, mountains, etc., when people are unable to achieve the construction of the line, the line of drones also show their talents, complete the task.
The situation of charging across the power usually exists in the process of circuit reconstruction.
It is necessary to straddle a new line on the basis of a power-on line.
In order to ensure the safety of construction workers, traditional construction can only be used first. After the line is powered off and then constructed, the overhead drone can be used to avoid power outages.